DSV Group Poland: New headquarters of DSV Group

11-09-2014

At the beginning of September DSV around 700 DSV employees moved into the brand new and modern DSV headquarters in Hedehusene, Denmark.

The DSV employees ware met by a modern and bright office and terminal building. The headquarters is built with focus of functionality, design and great infrastructure without compromising the green profile. Identical workstations designed to offer flexibility and obtain LEAN working conditions.
All floors have lounges, outdoor balconies and flex rooms for internal meetings. Workout area is located on the ground floor.

From the very beginning of building the new headquarters, being green has been a priority. Solar panels are installed on the roof of the terminal building and cover the entire headquarters’ power demand on days of maximum power production. Food waste will be ground and stored for subsequent use in biogas plants and for domestic heating. And new low-energy equipment is installed and "follow me printing" is expected to reduce paper consumption by 20-25%.  Everything to reduce the overall carbon emissions from our headquarters.

Infrastructure is particularly important when you are in the transport business and in Hedehusene we have virtually direct access to the Danish motorway system. We foresee up to 650 cars and 300 trucks through the gate on a busy day.

Some facts about the headquarters:
130,000 m2 site
16,000 m2 office space
12,000 m2 cross-docking terminal
47 meeting rooms
900 parking spaces

www.pl.dsv.com


DSV Group Poland - more news and informations

Designed by i2D